Key Performances:

> Maintenance Engineering

> Asset Management

​> Technical Writing 

> Requirement Management

> Equipment Specifications

> Tests and Inspections  

> Scheduling and planning 



Procedure Documnetation for Maintenance of 25kV TPS Asset

Key Performances:

> Module Engineering

> Concept Design

> Power Study

​> Cabling and trenching

> Hazard Analysis

> Integration management  



110/25kV Traction Power Supply for CRR

Cross River Rail Project, Brisbane, QLD  

​AECOM Australia

Senior Project Engineering, 2010 


Achievement:

Conceptual study and analysis for 110/25kV traction power substaions and TSCs have been conducted to figure out types, locations, sizes and connections of the traction power supply expansion for early stage of the cross river rail project in Brisbane CBD. After estimating the additional power requirement, the real challenge was how to integrate that extra power required into the existing network among the congested residential areas and how to find the best way and route for connections to the OHL.                     

Eagle Down Coal Mine, Bowen Basin, QLD  

​AECOM Australia

Senior Project Engineering, 2010 


Achievement:

Provisional design for Overhead Catenary System (Simple Catenary according to Mark IIIB standard) and its traction power was carried out for 8km balloon loop coal mine load out facility. In fact, it is considered as a siding of the existing QR heavy freight 50kV electrified railways. The package was prepared for the owner's tendering documents to form a D&C contract technical requirement.                  

Key Performances:

> Project Engineering

> Requirement management

> Concept Design

​> Cabling and trenching

> Hazard Analysis

​> Interface management

> Integration management

> Multidisciplinary design  



Overhead Lines and 50kV Traction Power for Coal Mine Balloon Loop 

Adelaide Metro Electrification, Adelaide, SA 

​Siemens Mobility Australia

Senior Project Engineering, 2011 


Achievement:

Preliminary design was carried out to connect 25kV traction feeders to the dedicated neutral section of the overhead line. Customer requirements, relevant standards, utility regulations, local council regulations, local terrain constrains were considered to arrange an efficient cabling and connection configuration. It was in total of six 66/25kV traction substations and dedicated neutral section of each was a few hundred meters up to a kilometer far away.               


Key Performances:

> Project Engineering

> Requirement management

> Concept Design

​> Cabling and trenching

> Hazard Analysis

​> Interface management

> Integration management

> Multidisciplinary design  



AC 25kV TPS Feeders Connection to OHL 

Key Performances:

> Lead Engineering

> Requirement management

​> Power Study

> Protection Study

> Redundancy Study

> Insulation Coordination

​> Power Quality Assessment

> RAMS, HA, FMECA


Gold Coast Light Rail, Gold Coast, QLD 

​Bombardier Transportation Australia

Project Lead Engineering, 2012 - 2013 


Achievements:

In order to figure out the traction network and equipment configuration, specifications and sizing, some network and field studies for 750VDC traction power supply have been conducted. They included Power Study,Load Flow Analysis, Protection (Short Circuit) Study and Insulation Coordination, all integrated with the customer requirements. Additionally, a Traction Power Quality assessment based on IEC61000 was conducted to prove the network compliance with the utility.       


750VDC Traction Power Supply System

Prefabricated 1.5MW 750VDC Traction Power Substations

My Key Performances:

> Lead Engineering

> Managing Design

> Requirement management

​> Review and Approval 

> Interface management

> Integration management

> RAMS Analysis


Gold Coast Light Rail, Gold Coast, QLD 

​Bombardier Transportation Australia

Project Lead Engineering, 2012 - 2013 


Achievements:

Seven prefabricated 1.5 MW 750VDC traction power substations (TPS) with diode rectifier and dry type 11/0.585 kV transformer have been successfully designed, constructed, tested, installed and commissioned on site. They are retrofit with AGS (Automatic Grounding Switch) and SCM (Stray Current Monitoring). Each TPS is fed by one 11kV feeder from Energex operated by an RMU (Ring Main Unit). 


  Clean Energy on Move 

25kV mass transit Electrified Railways, Perth, WA  

​Public Transport Authority

OHL&TPS Engineer, 2009 - 2010 


Achievement:

Asset management and maintenance of expensive asset of the electrified railways need a series of non stop efforts of a great dedicated team of professionals. Maintenance procedure for WA's several traction power substations and TSCs has been revised to be updated and reflect all necessary inspections and tests. Tests like Frequency Analysis for traction transformers have been initiated to strengthen the preventive maintenance and inspections activities.                           

Explore my Experiences within the Traction Power Supply projects

1500VDC TPS, 24km of Electrified mass transit (to be detailed soon)

   2x25kV (50kV) Traction Power Supply, electrification of 1000km urban transit ( to be detailed soon)

750VDC Shore Power Supply, Maintenance Workshop Light Rail (to be detailed soon)